Past Project

# Project Name Owner Period
1 Upgrading of Hong Kah Community Centre Peoples Association 23.11.00 - 05.01.01
2 Proposed Upgrading of Griffiths Primary School Ministry of Education 27.04.01 - 05.05.01
3 Propsoed A&A Works to South View Primary School Ministry of Education Jun-01 to Aug-01
4 Propsoed Upgrading of Monfort Junior School Ministry of Education Aug-01 to Oct-01
5 Proposed A&A Works for Thomson Baptist Church Thomson Baptist Church 13.03.02 - 27.03.02
6 Proposed Upgarding Project at Greenridge Primary School Ministry of Education Apr-02 to Jun-02
7 Proposed A&A Project to Existing Hwa Chong JC at Bukit Timah Road/Duchess Road Hwa Chong Junior College 22.07.02 - 30.08.02
8 Proposed Upgrading Works at Jurong Secondary School Ministry of Education 15.07.02 - 14.03.05
9 Proposed A&A Works to Beatty Secondary School Ministry of Education Feb-03 to May-03
10 Sentosa People's Mover System Sentosa Development Corporation Mar-03 to May-03
11 A&A Works to Existing Chinese Temple at Paya Lebar Kwan Im Tong Chinese Temple 28.11.03 to 04.12.03
12 Proposed Tower Crane Base at NUS Administration Building National University of Singapore 03.02.04 to 04.02.04
13 Proposed Remedial Works to 400KV Substation at Ubi Ave 3 / Ubi Road Power Grid Limited 06.03.04 to 09.03.04
14 A&A Works to Applied Science Bldg at Temasek Polytechnic Ministry of Education 15.07.04 to 03.08.04
15 Proposed A&A to Grace Church Grace Church 24.11.04 to 03.12.04
16 Proposed A&A to Pentecost Methodist Church at 4 Pasir Ris Drive 6 Pentecost Methodist Church 07.02.05 to 19.02.05
17 Proposed St Andrew Village at Potong Pasir Ministry of Education 15-Aug to 30-Aug-05
18 Church at Woodland Drive 16 Covenant Church Feb-07 to March 2007
19 Proposed Eden Church at 39 Lorong 25 Geylang Eden Church 1.9.08 to 15.10.08
20 Proposed A&A Works to Exisitng Block 1 to 10 SGH at Micropiles SGH 1.9.09 to 15.12.09
21 Proposed Addition and Extension of Emergency Unit at Tan Tock Seng Hospital Tan Tock Seng Hospital 1.9.09 to 30.10.09
22 Singapore General Hospital Block 4 SGH 7.2.11 to 31.3.11
23 A&A to Radin Mas Primary School Ministry of Education 15.3.11 to 5.6.11
24 A&A to Zhangde Primary Scool Ministry of Education 7.1.12 to 20.1.12
25 A&A to Ang Mo Kio Primary School Ministry of Education 2.8.11 to 19.1.12
26 A&A to Farrer Park Primary school Ministry of Education 22.11.11 to 28.12.11
27 Proposed A&A Works to St. Luke Hospital at Bukit Batok Street 11 St. Luke Hospital for Elderly Ltd 11.05.12 to 08.07.12
28 Proposed A&A Works to Ngee Ann Polytechnic, Blk 51 & 58 Ngee Ann Polytechnic 01.07.12 to 30.01.13
29 Proposed A&A To Lee Kong Chain Medicine School, NTU at Mandalay Rd Ministry of Education 07.05.12 to 15.07.12
30 National Heart Centre, SGH Ministry of Health 01.09.12 to 16.03.13
31 Proposed Erection of Malay Language Center at 11 Bishan St. 14 Ministry of Education 10.05.12 to 23.07.12
32 Proposed A&A to Asian Civilisation Museum at No 1 Empress Place National Musuem 10.02.14 to 09.03.14
# Project Name Owner Period
1 Proposed A&A Works for SIKH Temple at Bukit Merah Central Sikh Gurdwara Board Oct-01 to Nov-01
2 Proposed A&A Works to Food Factory at 14 Senoko Way Thong Seik Food Industry Pte Ltd 19.09.01 - 21.09.01
3 Proposed Micropiling Works for Changi Rise Condominium City Development Limited 30.11.01 - 20.12.01
4 Proposed A&A Works at Food Factory No. 1 Senoko Road Tee Yih Jia Food Manufacturing Pte Ltd Jun-02
5 Proposed A&A to Existing Detached Factory at 232 Pandan Loop Angliss Singapore Pte Ltd 21.03.02 - 26.03.02
6 Proposed Addition of a Single Storey Office cum Workshop to Existing Telok Blangah Pump Station at Telok Blangah Road Public Utilities Board Swerage Dept 03.04.02 - 18.04.02
7 Proposed A&A Works at Food Factory WTC Harbour Front Harbourfront Two Pte Ltd June '02 to July '02
8 Proposed A&A Works at No. 365 Bukit Timah Road Leng Kwang Baptist Church May'02
9 Proposed A&A Works for Chinese Garden Jurong Garden Pte Ltd July'02
10 Proposed A&A Works to 112 Robinson Road Underpining with micropiles Ho Bee Investment Ltd 01.10.02 - 31.04.03
11 Underground Pipe Support for Existing Natual Gas Pipelines at Jurong Island Semcorp Gas Pte Ltd 10.07.03 - 20.07.03
12 Construction of Covered Linkways at Woodlands Near Marsiling MRT Viaduct Area HDB 01.08.03 - 19.08.03
13 Proposed New Development at Race Course Road Ronny Chin & Associates 01.08.03 to 06.10.03
14 Proposed Development at 41 Desker Road Teck Seng Enterprises Pte Ltd 24.09.03 to 25.10.03
15 Proposed Construction of Transformer Room at No 1 Tuas Link 2 for Hoya Factory Hoya 07.10.03 to 09.10.03
16 A&A Works to Existing Chinese Temple at Paya Lebar Kwan Im Tong Chinese Temple 28.11.03 to 04.12.03
17 A&A Works to Existing Marina Square Complex Marina Centre Holdings Pte Ltd 04.02.04 to 07.07.05
18 Proposed Tuas Power Plant Stage II Tuas Power 16.02.04 to 17.03.04
19 Proposed Remedial Works to 400KV Substation at Ubi Ave 3 / Ubi Road Power Grid Limited 06.03.04 to 09.03.04
20 A&A Works to Clarke Quay CapitaLand 15.05.04 to 21.05.04
21 Proposed Erection of Monorail Stations at Sentosa Island Sentosa Development Corporation 23.08.04 to 08.10.04
22 Proposed Link Bridge at 103 Pioneer Rd Mitshubishi Chemicals 07.08.04 to 12.08.04
23 Tuas Power Station Tuas Power Limited 28.10.04 to 19.11.04
24 Proposed IPA, Gas & DI Plant at 7 Tuas Link 2 Hoya 09.10.04 to 11.10.04
25 Proposed A&A to Grace Church Grace Church 24.11.04 to 03.12.04
26 Proposed A&A to House No. 23 to 33 Mackenzies Road Wah Khiaw Properties Pte Ltd 08.01.05 to 29.01.05
27 Proposed Condominium Project at Lorong Sarhad Feature Land Pte Ltd 18.01.05 to 24.4.05
28 Contagious Micropiles Retaining Walls to Proposed Semi-Detached Houses at Jalan Dermawan ACG Development 08.06.05 to 30.7.2006
29 Proposed A&A Works at Clarke Quay of Blk A, B, C & D CapitaLand 13.04.05 to 30.4.2005
30 Proposed Crasy Horse Entertainment Centre at Clark Quay Eng Wah 1 Aug. 2005 to 14-Aug-05
31 Ramp Construction at Palawan Beach Sentosa Sentosa Development Corporation Aug-05 to Oct-06
32 A&A at Palm Grove Ave -Palm Grove Condominium MCST 1.11.2005 to 15.11.2005
33 A&A at 6 Tuas West Ave at Hoya Factory Hoya 1.12.2005 to
34 A&A at Tech Semiconductor Tech Semiconductor 1.10.2005 to 31.10.2005
35 St Regis Hotel and Residency at Tanglin Road CDL 10-Jan-06 to 10-Feb-06
36 A&A at Hiap Huat Building Bendemeer Road Hiap Huat 1.4.2006 to 8.4.2006
37 Proposed A&A Works at Clarke Quay for staircase and Canopy Support - Micropiling Works CapitaLand 2.4.2006 to 30.4.2005
38 A&A Jurong Point Shopping Centre (under MRT viaduct) Fraser Centrepoint 15.8.07 to 16.10.07
39 A&A to No 9 Tuas Link 2 at Hoya Factory Hoya 1.12.06 to 15.1.07
40 Seawall at Sentosa IR Microiples and Marine anchors Resort World Sentosa 1.12.07 to 14.1.08
41 Proposed Eden Church at 39 Lorong 25 Geylang Eden Church 1.9.08 to 15.10.08
42 Sentosa IR Project for RWS RWS 30.08.2007 to 31.7.08
43 Factory at Kaiki Bukit Eastview Development 16.8.08 to 15.10.08
44 Bukit Panjang Sport Complex Singapore Sports Council 21.2.09 to 30.8.09
45 The Arte Condominium Project at Jalan Datoh City Development June to Aug. 2009
46 Proposed Corridor Foundation at Hoya Factory at Tuas Hoya Singapore 16.1.10 to 25.1.10
47 Propsoed A&A to 53 Loyang Crescent Factory Admiralty International 28.9.09 to 29.1.10
48 Proposed 2 Storey Houses at Dunsfold Drive Tee International 9.7.09 to 15.8.09
49 Piling Work to Semi Detached Houses at Holland Grove Sunhuan Construction 1.10.10 to 3.12.10
50 A&A at 230kVA Sub-station at Tampines and Choa Choa Kang, Tampines and Ayer Rajah Crescent Power Grid 1.11.10 to 31.3.11
51 Marina Lighter MPA Whaft bvnbn
52 Piling Work to A&A Project at Proctor & Gamble Plant at Tuas West St P&G International Operation Pte Ltd nbmnm
53 A&A at 230kVA Sub-station at Tampines and Choa Choa Kang, Tampines and Ayer Rajah Crescent Power Grid 1.11.10 to 31.12.11
54 Sentosa IR MC06 Phase 2 RWS 1.3.11 to 31.7.11
55 Edward Life Center Beca Carter 1.9.11 to 30.9.11
56 368 Thomson Road Condominium - Micropiles CDL 1.10.11 to 10.10.11
57 9 and 111 Sommerville Road Development M/s Tng Kay Lim 5.10.11 to 14.11.11
58 Tree Top Project for Sentosa IR RWS 5.11.11 to 14.12.11
59 Proposed A&A Works to Parkway Parade Shopping Centre Lend Lease 21.05.12 to 07.06.12
60 Proposed A&A Works to Singapore Pool Building at 210 Middle Road Lend Lease 01.06.12 to 15.07.12
61 Erection of 6 Storey Building at 27 and 29 Kelantan Lane Singapore Environmental Services 15.09.12 to 30.10.12
62 Proposed Mixed Development at Bedok for Bedok Residence- Underground Link to MRT Capitol Land 01.09.12 to 31.01.13
63 A&A Works to Heeren Building at Orchard / Cairnhill Road Private Owner 26.02.13 to 24.04.13
64 No. 17 Institution Hill Redevelopment Project Private Owner 20.03.13 to 15.05.13
65 Underground Pedestrian Walkway at Orchard Emerald/Specialist Centre UE Orchard Pte 01.06.13 to 16.09.13
66 Linkbridge at 60 Woodlands Indust. Parrk D for Global Foundary Global Foundaries 10.09.13 to 02.10.13
67 35 and 37 Quality Road Extension to Existing Factory Tat Hui Foods 16.10.13 to 30.12.13
68 Proposed A&A Works to Marina Square Complex Marina Centre Holding Pte Ltd 28.04.13 to 28.02.14
69 Proposed South Beach Mixed Development at Beach Road South Beach Consortiun Pte Ltd 21.05.12 to
70 Proposed A&A Existing Stamford House, Capitol Threatre and Buildings Capitol Retail Management Pte Ltd 16.08.12 to 30.04.14
71 EON Building at 70 Shenton Way 70 Shenton Pte Ltd 15.07.13 to ongoing
72 Proposed A&A Works to 6 Shenton Way Alkas Reality Pte Ltd 15.09.13 to ongoing
73 A&A Works to Existing Factory at 29 Tuas WestRoad MGC Pure ChemicalsSingapore Pte Ltd May-14 to Jun-14
# Project Name Owner Period
1 Proposed A&A to 11 Underground MRT tations - Tiong Bahru, Bugis and City Hall Master Contract Services Pte Ltd Aug-04 to Dec-02
2 CCL Project, Contract 854 Bukit Brown Station Taisei Corporation 1.12.2005 to 31.3.2006
3 Pedestrian Overhead Bridge at Woodlands Ave 7 Chuan Lim 15.9.06 to 14.10.06
4 Retaining Wall at Jalan Buroh - Micropile Civil Geo/Tiong Seng JV 2.5.2006 to 30.9.06
5 Widening of Paya Lebar Road Micropiles to 3 Pedestrian Overhead Bridge Samwoh Asphalt March 07 to April 007
6 Proposed Pedestrain Overhead Brdige at Upper Paya Lebar Road, LTA Contract 3370C Samwoh Asphalt 5.10.09 to 31.10.09
7 Additional of lifts to Various MRT Stations at City Hall, Clementi, Queestown, Commonwealth, Toa Payoh, AMK and Bradell MRT Stations Expand Construction 1.8. to 30.8.10
8 Widening on CTE, Contract 285, 286 and 287 Downer EDI Works 1.10.2009 to 30th Oct 2010
9 Jurong East MRT Station Expansion Works Sato Kgoyo 1.7.10 to 1.9.10
10 Pedetrian Overhead Bridge at Bukit Timah Road Botanic Garden - Micropile/Soldier Piles Shincon Construction 1.9.10 to 30.11.10
11 Construction & Completion of Expo Station, Contract 922 LTA 30.01.12 to 25.02.12
12 Underground Link between Orchard MRT and Tangs Plaza LTA 01.02.12 to 30.10.13
13 Proposed POB Across KJE near Block 502A Chua Choa Kang LTA 01.06.12 to 17.08.12
14 DTL3-C931 TBM Thrust Block at Macpherson & Mattar Stations LTA 26.02.13 to 10.05.13
# Project Name Owner Period
1 Proposed PP Splitter Revamp at Pulau Bukom Shell Eastern Petroleum (Pte) Ltd Jul-00 to Aug-00
2 Proposed Piling Works for Sea Oxo Plant at Jurong island Shell Eastern Petroleum (Pte) Ltd Oct-00
3 Proposed Eastman Plant Phase 2 at Jurong Island Shell Eastern Petroleum (Pte) Ltd Dec'00
4 A&A Works at Syngas Plant at Jurong Island Syngas 30.03.01 - 10.04.01
5 Extension Works at Pulau Bukom Phase 2 Shell Eastern Petroleum (Pte) Ltd Jan-01
6 Tetramer Tank (Chiyoda) Jurong Island Chevron Oronite Pte Ltd 02.10.01 - 22.10.01
7 Proposed A&A Works for Syngas Plant Syngas 29.10.01 - 02.11.01
8 Proposed Culvert Works at Celanese Plant at 21 Seraya Avenue Public Utilities Board Sewerage Dept 03.08.01 - 11.08.01
9 Proposed A&A Works to Exxon Mobil Plant ExxonMobil Asia Pacific Pte Ltd Nov'02 - Dec'02
10 Underground Pipe Support for Existing Natual Gas Pipelines at Jurong Island Semcorp Gas Pte Ltd 10.07.03 - 20.07.03
11 SOP Project at Jurong Island for ExxonMobil ExxonMobil 16.12.03 to 08.01.04
12 Micropiling Wharf 8 abutment beam at Pulau Bukom, Singapore Shell Eastern Petroleum (Pte) Ltd 06.04.04 to 13.07.04
13 Proposed Micropiles for Adip Regen Project at Shell Bukom Shell Eastern Petroleum Pte Ltd 09.06.05 to 15-Jul-05
14 SMAG III Project at Sakra Ave Jurong Island SMAG 16.6.06 to 15.8.06
15 Pipe Rack Supports for Shell ECC Project Shell Eastern Petroleum (Pte) Ltd 1.3.2007 to 15.5.2007
16 Shell SBRM Project Shell Eastern Petroleum (Pte) Ltd 1.3.08 to 31.12.08
17 SRC Clean Fule Project SRC 1.9.08 to 15.10.08
18 5th Project at Mitsui Chemical, Seraya Mitsui Chemical 5.5.08 to 15.7.08
19 Shell Bukom - Proposed LRCCU Project Shell Eastern Petroleum (Pte) Ltd 15.6.09 to 30.10.09
20 HGU-2 Revamp at SRC, Jurong Island SRC 15.2.10 to 6.3.10
21 Bugis Project at Pulau Bukom Shell Eastern Petroleum (Pte) Ltd 1.5.11 to 31.7.11
22 Singapore Refinery Complex, CDU-1 Project SRC 10.6.11 to 18.7.11
23 SRC-CDU1 Project at Jurong Island SRC 13.6.11 to 31.6.11
24 Proposed Bugis Project at Bukom Shell Eastern Petroleum (Pte) Ltd 1.7.11 to 31.10.11
25 SRC-Electrical Sub-station at Jurong Island SRC 1.9.11 to 30.10.11
26 Proposed C2 Dryer at Pulau Bukom Shell 20.06.12 to 20.07.12
27 Regen V 3414 at Palau Bukom Shell 01.08.12 to 20.08.12
28 SSBR (TREX) Pipebridge Project at PCS Jurong Island Singapore Petrol Chemical Corporation 15.09.12 to 31.12.12
29 Platform Splitter Unit (PSU) at Pulau Bukom Shell 30.01.13 to 27.02.13
30 ECC Cogen (ISBL and OSBL) at Pulau Bukom Shell 09.04.13 to 13.11.13
31 Proposed MELS MTF for Mitsu Elastomers at Jurong Island Miisui Elastomers Singapore Pte Ltd 25.03.13 to 31.03.13
32 Proposed Cafee Project at Shell Bukom Shell 15.03.13 to 15.10.13
# Project Name Owner Period
New Public Housing Project at Housing & Development Board
1 Woodlands N2C12 Development April 00 to June 00
2 Bukit Batok N3C10 Development Sept 00 to April 01
3 Bukit Panjang N6C8 13.02.01 - 19.03.01
4 Ang Mo Kio N3C4 11.07.98 - 13.07.98
5 Bishan West N4 C30B Development 25.10.01 - 27.10.01
6 Woodlands, Contract N5C21 1.7.11 to 31.10.11
Proposed Main Upgading Project To HDB Esatate Housing & Development Board
7 TPY North and Central Precinct (MUP 15) 01.08.02-30.04.03
8 Dover Road Precinct (MUP 17) 1.3.03 - 1.9.03
9 Holland Park View Main Upgrading (MUP 17) 25.10.03 - 2.3.04
10 Lorong Limau Precinct (MUP C18a) 12.12.03 - 19.3.05
11 Holland Oasis Precinct (MUP 18) 17.8.04-31.12.04
12 Telok Blangah Heights/Drive (MUP 19) 1.2.05 to 30.6.05
13 Ang Mo Kio Precinct (MUP 22) 15.3.09 - 16.9.09
14 Chai Chee/Bedok Reservior Precincts (MUP 19) 1.8.07 - 11.1.08
15 Circuit Road/Pipt Road Precinct (MUP 64B) 15.8.09 - 16.3.10
Lift Upgrading Contract Housing & Development Board
16 Contract C2 06.06.02 - 14.12.02
17 Contract C3 1.3.02 - 15.6.03
18 Contract C4 16.4.03 - 3.3.04
19 Contract C12 25.2.05 - 31.7.05
20 Contract C16 20.12.05 - 30.4.06
21 Contract C20 1.6.06 - 1.12.06
22 Contract C24 1.3.07 - 30.5.07
23 Contract C26 1.6.07 to 11.7.07
24 Contract C28 1.10.07 to 21.4.08
25 Contract C33 1.9.07 to 17.12.07
26 Contract C34 1.9.07 to 16.11.07
27 Contract C36 16.12.07 to 25.4.08
28 Contract C37 2.1.08 to 30.4.08
29 Contract C40 1.11.07 to 24.4.08
30 Contract C43 15.1.08 to 30.8.08
31 Contract C45 15.1.08 to 30.8.08
32 Contract C51 20.5.08 to 30.11.08
33 Contract C56 1.8.08 to 30.11.08
34 Contract C57 1.11.08 to 28.2.09
35 Contract C59 2.2.09 to 30.6.09
36 Contract C63 1.12.10 to 31.5.11
37 Contract C64B 1.8.10 to 31.3.11
38 Contract C71 30.01.13 to 16.06.13
Design and Build Contract for Lift Upgarding Projects Housing & Development Board
39 Bulk Contract G1A 1.10.08 - 12.1.09
40 Bulk Contract G2B 2.2.10 - 30.6.10
41 Bulk Contract G5B 1.5.10 to Current
42 Bulk Contract G7A 1.12.10 to Current
43 Bulk Contract G6D 1.8.10 - 31.3.11
44 Bulk Contract G8C 1.7.10 to 30.10.11
45 Bulk Contract G10D 1.10.11- Current
46 Bulk Contract G12D 01.09.12 to 31.01.14
Culvert Construction at Jurong West St 64 Housing & Development Board June 00 to Aug 00
47 Upgrading of Rental Flat (Batch 3&6) Aug'02 - Apr'03
48 Pedestrian Overhead Bridge at Woodland Ave 7 15.9.06 - 14.10.06
# Project Name Owner Period
1 Marine Jetty at Pulau Seraya - Marine Anchors Singapore Oil Tanking 11.12.04 to 12.05.05
2 Contagious Micropiles Retaining Walls to Proposed Semi-Detached Houses at Jalan Dermawan Micropiles and Soil Nials ACG Development 08.06.05 to 30.7.2006
3 Ramp Construction at Palawan Beach Sentosa Micropiles, Soil Nails and Gunite Wall SDC Aug-05 to Oct-06
4 CCL Project, Contract 854 Bukit Brown Station - Tension Anchors LTA 1.12.2005 to 31.3.2006
5 ASL Marine Jetty at Tanjung Uncung Batam, Indonesia Marine Anchors ASL Marine 2.9.05 to 1.7.05
6 Marine Anchors for Oiltanking Project at Jurong Island, Phase 6 Oiltanking Singapore 20.3.06 to 10.4.06
7 VOPAK Terminal at Jurong Island - Marine anchors VOPAK Terminal 2.11.06 to 30.12.06
8 Universal Terminal at Banyan Ave, Jurong Island - Marine Anchors to Universal Terminal 1.8.06 to 15.5.07
9 Marine Jetty at Pulau Busing Zhen Hua (Contractor) 1.7.07 to 30.8.07
10 Seawall at Sentosa IR Microiples and Marine anchors Resort World Sentosa 1.12.07 to 14.1.08
11 A&A to Hin Leong Storage and Terminal Facilities at Banyan Logispark Hin Leong 15.1.08 to 30.1.08
12 Sentosa IR Project Micropiles and Soil Nail - Wall gunite wall and ground anchors RWS 30.08.2007 to 31.7.08
13 Marina Bay Sand Project - Marine Anchor MBS 1.10.09 to 21.1.10
14 Sentosa IR Phase 2 Project-Contract MC06 - Temporary Removalbe Anchors and Micropile RWS 1st Aug. 2010 to 30th Oct 2010
15 Registry of Marriage at Fort Canning - Soil Nails and Soldier Piles Registry of Marriage 4th Aug to 15.12.10
16 Proposed Ng Teng Fong Hospital at Jurong Ground Anchors Ministry of Health 4th Aug to 15.12.11
17 Marine Jetty at Batam Shipyard, Phase 3 ASL Marine 02.05.12 to 15.06.12
# Project Name Owner Period
1 Jet Grouting Works to Tengah Airbase DSTA May-14 to Ongoing
2 Proposed Toe Pin Works to Jurong Shipyard at Tuas South Jurong Shipyard Pte Ltd May-14 to Ongoing